# NERL EVCPs

Web page: https://ampmap.co.uk/charger/nerl-evcps-2-uk

NERL EVCPs is an EV charging site in Alnwick, Northumberland, run by NERL EVCPs and open 24 hours a day. All 3 of its sockets are 7 kW Type 2. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 2 charging sessions here over the last 30 days.

## Status

3 of 3 open at 22 Nov 2026, 12:31 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Rugley Road, NE66 2AG
- **Area:** Alnwick, Northumberland, United Kingdom
- **Coordinates (latitude, longitude):** 55.40238, -1.71794

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 3 | Not listed | 3 free |

## Site information

- **Operator:** NERL EVCPs
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at NERL EVCPs?

Up to 7 kW AC via Type 2.

### How many charging sockets does NERL EVCPs have?

3 charging sockets: 3 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Is NERL EVCPs open 24/7?

Yes - NERL EVCPs is open 24 hours a day, 7 days a week.

### When is NERL EVCPs busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is NERL EVCPs?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 2 observed charging sessions.

### Who operates NERL EVCPs?

NERL EVCPs is on the NERL EVCPs network.

### How long does a Tesla Model Y Long Range take to charge at NERL EVCPs?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at NERL EVCPs?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at NERL EVCPs?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Alnwick](https://ampmap.co.uk/chargers/united-kingdom/northumberland/alnwick)
- [NERL EVCPs chargers](https://ampmap.co.uk/networks/nerl-evcps)

## Chargers near this site

- [Westgate House Car Park 1, Clayport St, Alnwick · Connected Kerb](https://ampmap.co.uk/charger/connected-kerb-westgate-house-car-park-1-clayport-st-alnwick-uk) - Type 2 7 kW · Clayport Street
- [Dispensary Street Car Park · EO Charging](https://ampmap.co.uk/charger/eo-charging-dispensary-street-car-park-uk) - Type 2 22 kW · Dispensary Street
- [Willowburn Sports and Lesuire Centre · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-willowburn-sports-and-lesuire-centre-uk) - CCS 50 kW, CHAdeMO 50 kW · Willowburn Avenue
- [Willowburn Retail Park · Be.EV](https://ampmap.co.uk/charger/be-ev-willowburn-retail-park-uk) - CCS 150 kW · Willowburn Retail Park, Taylor Drive · From 89p/kWh
- [Willowburn Retail Park, Alnwick · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-willowburn-retail-park-uk) - CCS 300 kW, CCS 150 kW · Willowburn Ave · From 89p/kWh
- [Greenwell Road · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-greenwell-road-uk) - CCS 50 kW, CHAdeMO 50 kW · Greenwell Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/nerl-evcps-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: NERL EVCPs (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
