Pod Point Ancaster Nissan Penge is an EV charging site in South Norwood, Greater London, run by Pod Point. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

Offline at 23 Nov 2026, 02:07 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 61 Croydon Road Beckenham, Crystal Palace, SE20 7TF
- **Area:** South Norwood, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.41114, -0.05504
- **Getting there:** For any parking restrictions that may apply, please check relevant signage.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Free | Status unknown |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Pod Point
- **Opening hours:** Not published

## Common questions

### How much does it cost to charge at Pod Point Ancaster Nissan Penge?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Pod Point Ancaster Nissan Penge?

Up to 7 kW AC via Type 2.

### How many charging sockets does Pod Point Ancaster Nissan Penge have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

### Who operates Pod Point Ancaster Nissan Penge?

Pod Point Ancaster Nissan Penge is on the Pod Point network.

### How long does a Tesla Model Y Long Range take to charge at Pod Point Ancaster Nissan Penge?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Ancaster Nissan Penge?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Pod Point Ancaster Nissan Penge?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in South Norwood](https://ampmap.co.uk/chargers/united-kingdom/greater-london/south-norwood)
- [Pod Point chargers](https://ampmap.co.uk/networks/pod-point)

## Chargers near this site

- [Clevedon Road · Total Energies](https://ampmap.co.uk/charger/total-energies-clevedon-road-uk) - Type 2 7 kW, J-1772 4 kW · 1 Clevedon Road
- [Maple Road · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-maple-road-uk) - CCS 50 kW · Penge, Bromley
- [Shell Recharge Shell Beckenham](https://ampmap.co.uk/charger/shell-recharge-shell-beckenham-uk) - CCS / CHAdeMO 50 kW · 128-136 Beckenham Rd, Beckenham · From 89p/kWh
- [Penge East Station (site 2) · Total Energies](https://ampmap.co.uk/charger/total-energies-penge-east-station-site-2-uk) - Type 2 7 kW, J-1772 3 kW · Penge East Station (site 2)
- [Penge East Station · Total Energies](https://ampmap.co.uk/charger/total-energies-penge-east-station-uk) - Type 2 7 kW, J-1772 4 kW · Station Road
- [The Spa Car Park Site 2 · Total Energies](https://ampmap.co.uk/charger/total-energies-the-spa-car-park-site-2-uk) - Type 2 7 kW, J-1772 3 kW · The Spa Car Park Site 2

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/nissan-uk-dealer-network-ancaster-nissan-penge-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Pod Point (synced 22 Nov 2026).