Nissan UK Dealer Network · EV charging site
Ancaster Nissan Shepperton
Walton Bridge Road, Walton-on-Thames, TW17 8NE
Ancaster Nissan Shepperton is an EV charging site in Walton-on-Thames, Surrey, run by Nissan UK Dealer Network. Its 2 sockets reach up to 50 kW, with CHAdeMO at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bannatyne Health Club & Spa (InstaVolt Ltd), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Customers only
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ancaster Nissan Shepperton (Nissan UK Dealer Network)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Ancaster Nissan Shepperton (Nissan UK Dealer Network) have?
2 charging sockets: 2 × 7 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Ancaster Nissan Shepperton?
Ancaster Nissan Shepperton is on the Nissan UK Dealer Network network.
Can anyone charge at Ancaster Nissan Shepperton (Nissan UK Dealer Network)?
The operator lists this charger for customers of the site.
Where is the nearest other charger with 50 kW or more to Ancaster Nissan Shepperton (Nissan UK Dealer Network)?
Bannatyne Health Club & Spa (InstaVolt Ltd) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ancaster Nissan Shepperton (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ancaster Nissan Shepperton (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ancaster Nissan Shepperton (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- SUCC Thurlestone Parade 1
- Rawowned Travelodge 1
- Bannatyne Health Club & Spa
- EVC Oatlands Park Hotel
- Pod Point PA Housing - Argyle House
- Pod Point Walton Health Centre Carpark
- Cheapest nearby
- Pod Point Walton Health Centre Carpark · 34.8p per kWh · 7 kW · 1.5 mi