Nissan UK Dealer Network · EV charging site
Baileys Nissan
Westminster Road, Canterbury, CT1 1YY
Baileys Nissan is an EV charging site in Canterbury, Kent, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2, and charging is listed as free. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MFG Lakeside (MFG EV Power), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 15 Dec 2016)
- Notes
- POD Point Open Charge Unit
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Baileys Nissan (Nissan UK Dealer Network)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Baileys Nissan (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does Baileys Nissan (Nissan UK Dealer Network) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Baileys Nissan?
Baileys Nissan is on the Nissan UK Dealer Network network.
Can anyone charge at Baileys Nissan (Nissan UK Dealer Network)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Baileys Nissan (Nissan UK Dealer Network)?
MFG Lakeside (MFG EV Power) is 0.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Baileys Nissan (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Baileys Nissan (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Baileys Nissan (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- MFG Lakeside
- Canterbury City Council
- Canterbury City Council Offices
- North Holmes Road
- Beverley Road
- Rutherford Car Park - University of Kent
- Fastest nearby
- MFG Lakeside · 150 kW · 0.2 mi