Nissan UK Dealer Network · EV charging site
Dealership wall
Centurion Way, Hereford, HR1 1LW
Dealership wall is an EV charging site in Hereford, Herefordshire, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Hereford (GeniePoint), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Side of Nissan showroom. Access to Nissan owners only. Please report to reception during working hours. Fitted under Midlands PiP
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Dealership wall (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does Dealership wall (Nissan UK Dealer Network) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Dealership wall?
Dealership wall is on the Nissan UK Dealer Network network.
Where is the nearest charger with 50 kW or more to Dealership wall (Nissan UK Dealer Network)?
Morrisons Hereford (GeniePoint) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dealership wall (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dealership wall (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dealership wall (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons Hereford
- Old Market Shopping Centre Car Park
- Pod Point Old Market Hereford (Hereford Shopping Centre Limited Partnership)
- Venns Close Car Park Hereford - 70539
- Hereford Council Offices Plough Lane Her
- RAW Greene King Grandstand 2
- Cheapest nearby
- Pod Point Old Market Hereford (Hereford Shopping Centre Limited Partnership) · 49.2p per kWh · 7 kW · 1.1 mi
- Fastest nearby
- Morrisons Hereford · 50 kW · 0.9 mi