# J & J Motors Nissan · Nissan UK Dealer Network

Web page: https://ampmap.co.uk/charger/nissan-uk-dealer-network-j-and-j-motors-nissan-uk

J & J Motors Nissan is an EV charging site in Ammanford, Carmarthenshire, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Crosshands Business Park, SA14 6RB
- **Area:** Ammanford, Carmarthenshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.79339, -4.07745
- **Getting there:** Dealership opening hours only: Mo-Fri 08:30-18:30, Sa 08:30-17:00,Su 10:00-16:00

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Nissan UK Dealer Network
- **Opening hours:** Not published
- **Access:** Public

## Common questions

### How much does it cost to charge at J & J Motors Nissan (Nissan UK Dealer Network)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at J & J Motors Nissan (Nissan UK Dealer Network)?

Up to 7 kW AC via Type 2.

### How many charging sockets does J & J Motors Nissan (Nissan UK Dealer Network) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates J & J Motors Nissan?

J & J Motors Nissan is on the Nissan UK Dealer Network network. For site issues, the operator lists +44 844 846 4376.

### How long does a Tesla Model Y Long Range take to charge at J & J Motors Nissan (Nissan UK Dealer Network)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at J & J Motors Nissan (Nissan UK Dealer Network)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at J & J Motors Nissan (Nissan UK Dealer Network)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Ammanford](https://ampmap.co.uk/chargers/united-kingdom/carmarthenshire/ammanford)
- [Nissan UK Dealer Network chargers](https://ampmap.co.uk/networks/nissan-uk-dealer-network)

## Chargers near this site

- [Cross Hands EV Hub · POGO](https://ampmap.co.uk/charger/evolt-network-cross-hands-ev-hub-uk) - CCS 150 kW, CHAdeMO 50 kW · Cross Hands · From 56p/kWh
- [Hoel-yNeuadd Car Park · Clenergy](https://ampmap.co.uk/charger/clenergy-hoel-yneuadd-car-park-uk) - Type 2 22 kW · Hoel-y-Neuadd Road
- [EH - Roadchef Pont Abraham · GRIDSERVE](https://ampmap.co.uk/charger/gridserve-roadchef-pont-abraham-services-uk) - CCS 360 kW, CCS 34 kW · M4 Jct 49 · From 92p/kWh
- [Woodfield Car Park · Clenergy](https://ampmap.co.uk/charger/clenergy-woodfield-car-park-uk) - Type 2 22 kW · Woodfield Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/nissan-uk-dealer-network-j-and-j-motors-nissan-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 Nov 2015).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
