Nissan UK Dealer Network · EV charging site
Nissan Chorley
Ackhurst Road, Chorley, PR7 1NN
Nissan Chorley is an EV charging site in Chorley, Lancashire, run by Nissan UK Dealer Network. Its 2 sockets reach up to 50 kW, with CHAdeMO at the top speed, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Market Street Chorley (BP Pulse), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 14 Jun 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Nissan Chorley (Nissan UK Dealer Network)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Nissan Chorley (Nissan UK Dealer Network)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Nissan Chorley (Nissan UK Dealer Network) have?
2 charging sockets: 2 × 7 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Nissan Chorley?
Nissan Chorley is on the Nissan UK Dealer Network network.
Can anyone charge at Nissan Chorley (Nissan UK Dealer Network)?
The operator lists this charger for customers of the site.
Where is the nearest other charger with 50 kW or more to Nissan Chorley (Nissan UK Dealer Network)?
Market Street Chorley (BP Pulse) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nissan Chorley (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nissan Chorley (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nissan Chorley (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Chorley
- Cleveland Street car park
- ICUEVE900235
- Market Street Chorley
- Chorley Flat Iron Car Park
- Chorley & South Ribble 1
- Cheapest nearby
- Pod Point Tesco Extra - Chorley · 44.4p per kWh · 7 kW · 0.2 mi