Nissan UK Dealer Network · EV charging site
Nissan Main Car Park
Washington Road, SR5 3HZ
Nissan Main Car Park is an EV charging site in Washington, Sunderland, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is EH - Gateshead College (GRIDSERVE), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Nissan Main Car Park
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Nissan Main Car Park (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does Nissan Main Car Park (Nissan UK Dealer Network) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Nissan Main Car Park?
Nissan Main Car Park is on the Nissan UK Dealer Network network.
Where is the nearest charger with 50 kW or more to Nissan Main Car Park (Nissan UK Dealer Network)?
EH - Gateshead College (GRIDSERVE) is 0.2 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nissan Main Car Park (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nissan Main Car Park (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nissan Main Car Park (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Nissan EAST NMUK Offices
- Gateshead College Nissan Site
- Sunderland
- EH - Gateshead College
- Nissan Hangar Car Park
- Town Centre Citroen
- Cheapest nearby
- EH - Gateshead College · 85p per kWh · 60 kW · 0.2 mi
- Fastest nearby
- EH - Gateshead College · 60 kW · 0.2 mi