Nissan UK Dealer Network · EV charging site
Nissan Rowstock
Newbury Motor Park, RG14 7HT
Nissan Rowstock is an EV charging site in Newbury, West Berkshire, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2, and charging is listed as free. 21 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Two Watermills, Newbury (Osprey Charging), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Public · notice required
- Price
- Free(from Open Charge Map, 16 Jun 2015)
- Phone (from Open Charge Map)
- +44 1635 569770
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Nissan Rowstock (Nissan UK Dealer Network)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Nissan Rowstock (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does Nissan Rowstock (Nissan UK Dealer Network) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Nissan Rowstock?
Nissan Rowstock is on the Nissan UK Dealer Network network. For site issues, the operator lists +44 1635 569770.
Where is the nearest charger with 50 kW or more to Nissan Rowstock (Nissan UK Dealer Network)?
Two Watermills, Newbury (Osprey Charging) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nissan Rowstock (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nissan Rowstock (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nissan Rowstock (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Newbury
- Two Watermills, Newbury
- ubitricity Distributed Energy Systems UK Ltd. 26 Jago Court
- ubitricity Distributed Energy Systems UK Ltd. 15 Jago Court, Opp.
- ubitricity Distributed Energy Systems UK Ltd. 39 Jago Court
- ubitricity Distributed Energy Systems UK Ltd. 103 Greenham Road
- Cheapest nearby
- Pod Point Tesco Extra - Newbury · 44.4p per kWh · 22 kW · 0.1 mi
- Fastest nearby
- Two Watermills, Newbury · 50 kW · 0.3 mi