# Nissan Rowstock · Nissan UK Dealer Network

Web page: https://ampmap.co.uk/charger/nissan-uk-dealer-network-nissan-rowstock-uk

Nissan Rowstock is an EV charging site in Newbury, West Berkshire, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Newbury Motor Park, RG14 7HT
- **Area:** Newbury, West Berkshire, United Kingdom
- **Coordinates (latitude, longitude):** 51.38372, -1.31499

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Nissan UK Dealer Network
- **Opening hours:** Not published
- **Access:** Public · notice required

## Common questions

### How much does it cost to charge at Nissan Rowstock (Nissan UK Dealer Network)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Nissan Rowstock (Nissan UK Dealer Network)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Nissan Rowstock (Nissan UK Dealer Network) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates Nissan Rowstock?

Nissan Rowstock is on the Nissan UK Dealer Network network. For site issues, the operator lists +44 1635 569770.

### How long does a Tesla Model Y Long Range take to charge at Nissan Rowstock (Nissan UK Dealer Network)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nissan Rowstock (Nissan UK Dealer Network)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Nissan Rowstock (Nissan UK Dealer Network)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newbury](https://ampmap.co.uk/chargers/united-kingdom/west-berkshire/newbury)
- [Cheapest charging in Newbury](https://ampmap.co.uk/chargers/united-kingdom/west-berkshire/newbury/cheapest)
- [Nissan UK Dealer Network chargers](https://ampmap.co.uk/networks/nissan-uk-dealer-network)

## Chargers near this site

- [Pod Point Tesco Extra - Newbury](https://ampmap.co.uk/charger/pod-point-tesco-extra-newbury-uk) - Type 2 22 kW, Type 2 7 kW · Pinchington Lane · From 44.4p/kWh
- [Two Watermills, Newbury · Osprey Charging](https://ampmap.co.uk/charger/osprey-charging-two-watermills-pub-and-restaurant-uk) - CCS 50 kW, CHAdeMO 50 kW · Newtown Road · From 89p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 26 Jago Court](https://ampmap.co.uk/charger/ubitricity-26-jago-court-uk) - Ubitricity · Type 2 5 kW · 26 Jago Court · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 15 Jago Court, Opp.](https://ampmap.co.uk/charger/ubitricity-15-jago-court-opp-uk) - Ubitricity · Type 2 5 kW · 15 Jago Court, Opp. · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 39 Jago Court](https://ampmap.co.uk/charger/ubitricity-39-jago-court-uk) - Ubitricity · Type 2 5 kW · 39 Jago Court · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 103 Greenham Road](https://ampmap.co.uk/charger/ubitricity-103-greenham-road-uk) - Ubitricity · Type 2 5 kW · 103 Greenham Road · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/nissan-uk-dealer-network-nissan-rowstock-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 16 Jun 2015).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
