Nissan UK Dealer Network · EV charging site
Pentagon Barnsley-Nissan
Claycliffe Road, Darton, S75 1LR
Pentagon Barnsley-Nissan is an EV charging site in Darton, Barnsley, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2, and charging is listed as free. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Toby Carvery Dodworth Valley (BP Pulse), 1.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 15 Aug 2022)
- Notes
- This is an open charge unit installed at the Pentagon Barnsley - Nissan dealership in Claycliffe Road, Barugh Green, Barnsley. The chargepoint is restricted to Nissan customers and on site EV's
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pentagon Barnsley-Nissan (Nissan UK Dealer Network)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Pentagon Barnsley-Nissan (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does Pentagon Barnsley-Nissan (Nissan UK Dealer Network) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Pentagon Barnsley-Nissan?
Pentagon Barnsley-Nissan is on the Nissan UK Dealer Network network.
Where is the nearest charger with 50 kW or more to Pentagon Barnsley-Nissan (Nissan UK Dealer Network)?
Toby Carvery Dodworth Valley (BP Pulse) is 1.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pentagon Barnsley-Nissan (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pentagon Barnsley-Nissan (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pentagon Barnsley-Nissan (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Church Street Car Park, Darton 1
- West Road Pay and Display Car Park, Barnsley 1
- Pod Point Barnsley Hospital NHS Foundation Trust
- Toby Carvery Dodworth Valley
- Churchfields Car Park
- Sackville Street Car Park
- Cheapest nearby
- Pod Point Barnsley Hospital NHS Foundation Trust · 30p per kWh · 7 kW · 1.4 mi
- Fastest nearby
- Toby Carvery Dodworth Valley · 50 kW · 1.6 mi