Nissan UK Dealer Network · EV charging site
Side of Nissan showroom
Corporation Road, Grimsby, DN31 1UH
Side of Nissan showroom is an EV charging site in Grimsby, North East Lincolnshire, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Millfields Hotel (BP Pulse), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Side of Nissan showroom. Access to Nissan owners only. Please report to reception during working hours. Fitted under Midlands PiP
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Side of Nissan showroom (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does Side of Nissan showroom (Nissan UK Dealer Network) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Side of Nissan showroom?
Side of Nissan showroom is on the Nissan UK Dealer Network network.
Where is the nearest charger with 50 kW or more to Side of Nissan showroom (Nissan UK Dealer Network)?
Millfields Hotel (BP Pulse) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Side of Nissan showroom (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Side of Nissan showroom (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Side of Nissan showroom (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Freshney Place Shopping Centre
- Pod Point Tesco Extra - Grimsby
- The St. James Hotel
- Wellington Street
- Millfields Hotel
- Woad Lane
- Cheapest nearby
- Pod Point Freshney Place Shopping Centre · Free · 7 kW · 0.4 mi
- Fastest nearby
- Millfields Hotel · 50 kW · 1 mi