# St. Leonards Nissan · Nissan UK Dealer Network

Web page: https://ampmap.co.uk/charger/nissan-uk-dealer-network-st-leonards-nissan-uk

St. Leonards Nissan is an EV charging site in Hastings, East Sussex, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Church Wood Drive, TN38 2QQ
- **Area:** Hastings, East Sussex, United Kingdom
- **Coordinates (latitude, longitude):** 50.87538, 0.53091
- **Getting there:** entrance to service car park off Brunel Road.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Nissan UK Dealer Network
- **Opening hours:** Not published
- **Access:** Private · notice required
- **Notes:** Phone ahead to check availability and opening times

## Common questions

### How much does it cost to charge at St. Leonards Nissan (Nissan UK Dealer Network)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at St. Leonards Nissan (Nissan UK Dealer Network)?

Up to 7 kW AC via Type 2.

### How many charging sockets does St. Leonards Nissan (Nissan UK Dealer Network) have?

2 charging sockets: 2 × 7 kW Type 2.

### Who operates St. Leonards Nissan?

St. Leonards Nissan is on the Nissan UK Dealer Network network. For site issues, the operator lists +44 1424 854000 St Leonards Motors Nissa.

### Can anyone charge at St. Leonards Nissan (Nissan UK Dealer Network)?

The operator lists this charger as private - access is restricted.

### How long does a Tesla Model Y Long Range take to charge at St. Leonards Nissan (Nissan UK Dealer Network)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St. Leonards Nissan (Nissan UK Dealer Network)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at St. Leonards Nissan (Nissan UK Dealer Network)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Hastings](https://ampmap.co.uk/chargers/united-kingdom/east-sussex/hastings)
- [Nissan UK Dealer Network chargers](https://ampmap.co.uk/networks/nissan-uk-dealer-network)

## Chargers near this site

- [Pod Point Tesco Extra - Hastings](https://ampmap.co.uk/charger/pod-point-tesco-extra-hastings-uk) - Type 2 7 kW · Church Wood Drive · From 44.4p/kWh
- [Premier Inn Hastings · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-premier-inn-hastings-uk) - Type 2 60 kW, CHAdeMO 50 kW · Premier Inn Hastings
- [Bannatyne Health Club Hastings · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-bannatyne-health-club-hastings-uk) - CCS 50 kW, CHAdeMO 50 kW · Battle Road
- [Bohemia Petrol Station · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-bohemia-petrol-station-uk) - CCS 50 kW, CHAdeMO 50 kW · Bohemia Road
- [Marina Car Park, St. Leonards · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-marina-car-park-st-leonards-uk) - CCS 50 kW, CHAdeMO 50 kW · Marina Car Park
- [MFG Glyne Gap · MFG EV Power](https://ampmap.co.uk/charger/mfg-ev-power-mfg-glyne-gap-uk) - CCS 150 kW, CHAdeMO 50 kW · Hastings Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/nissan-uk-dealer-network-st-leonards-nissan-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 20 Mar 2015).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
