Nissan UK Dealer Network · EV charging site
Westway Nissan Basingstoke
Edison Road, Basingstoke, RG21 6YH
Westway Nissan Basingstoke is an EV charging site in Basingstoke, Hampshire, run by Nissan UK Dealer Network. Both of its sockets are 7 kW Type 2, and charging is listed as free. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Basingstoke, UK (Tesla), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Nissan UK Dealer Network
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 16 Aug 2022)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Westway Nissan Basingstoke (Nissan UK Dealer Network)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Westway Nissan Basingstoke (Nissan UK Dealer Network)?
Up to 7 kW AC via Type 2.
How many charging sockets does Westway Nissan Basingstoke (Nissan UK Dealer Network) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Westway Nissan Basingstoke?
Westway Nissan Basingstoke is on the Nissan UK Dealer Network network.
Where is the nearest charger with 50 kW or more to Westway Nissan Basingstoke (Nissan UK Dealer Network)?
Basingstoke, UK (Tesla) is 0.3 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Westway Nissan Basingstoke (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Westway Nissan Basingstoke (Nissan UK Dealer Network)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Westway Nissan Basingstoke (Nissan UK Dealer Network)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Taran Microsystems Ltd
- Basingstoke, UK
- ICUEVE900605
- Morrisons Basingstoke
- Morrisons Basingstoke
- Churchill Way Car Park, Basingstoke
- Cheapest nearby
- Basingstoke, UK · 59p per kWh · 250 kW · 0.3 mi
- Fastest nearby
- Basingstoke, UK · 250 kW · 0.3 mi