EV charging site
Nottingham Trent University City Campus
Chaucer Court, Nottingham, NG1 5JD
Nottingham Trent University City Campus is an EV charging site in Nottingham. Both of its sockets are 7 kW Type 2, and charging is listed as free. 29 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Peel Street (BP Pulse), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free(from Open Charge Map, 8 Oct 2016)
- Notes
- Elektromotive charge point
- Getting there
- Access for visitors and staff, behind barrier
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Nottingham Trent University City Campus?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Nottingham Trent University City Campus?
Up to 7 kW AC via Type 2.
How many charging sockets does Nottingham Trent University City Campus have?
2 charging sockets: 2 × 7 kW Type 2.
Can anyone charge at Nottingham Trent University City Campus?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to Nottingham Trent University City Campus?
Peel Street (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nottingham Trent University City Campus?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nottingham Trent University City Campus?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nottingham Trent University City Campus?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Peel Street
- Hanley Street
- Mount Street
- Intu Victoria, North - Nottingham
- intu Victoria Shopping Centre
- Nottingham, UK
- Cheapest nearby
- Nottingham, UK · 50p per kWh · 250 kW · 0.4 mi
- Fastest nearby
- Nottingham, UK · 250 kW · 0.4 mi