EV charging site
Nottingham University Jubillee Campus ATC 1
The University of Nottingham, Basford, NG8 1BB
Nottingham University Jubillee Campus ATC 1 is an EV charging site in Basford, Nottingham. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Faraday Road (BP Pulse), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 17 Jul 2019)
- Phone (from Open Charge Map)
- (0)115 951 5151
- Notes
- Fitted under Midlands PiP
- Getting there
- Behind Aerospace Building Visitor or Staff Parking Permit required
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Nottingham University Jubillee Campus ATC 1?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Nottingham University Jubillee Campus ATC 1?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Nottingham University Jubillee Campus ATC 1 have?
4 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Where is the nearest charger with 50 kW or more to Nottingham University Jubillee Campus ATC 1?
Faraday Road (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Nottingham University Jubillee Campus ATC 1?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nottingham University Jubillee Campus ATC 1?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Nottingham University Jubillee Campus ATC 1?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Faraday Road
- Lenton Blvd
- Rose & Crown (Lenton)
- 243A Denman St W
- Denman Street Car Park, Nottingham
- Garfield Car Parking, Garfield Road
- Cheapest nearby
- 243A Denman St W · 65p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- Rose & Crown (Lenton) · 75 kW · 0.3 mi