Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

EV charging site

Nottingham University Jubillee Campus ATC 1

The University of Nottingham, Basford, NG8 1BB

Nottingham University Jubillee Campus ATC 1 is an EV charging site in Basford, Nottingham. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 8 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Faraday Road (BP Pulse), 0.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 17 Jul 2019Last verified 17 Jul 2019

Connectors

Type 2 · 7 kW1 connector
BS1363 3 Pin 13 Amp · 3 kW1 connector

Site information

Opening hours
Not published
Access
Public
Price
Free(from Open Charge Map, 17 Jul 2019)
Phone (from Open Charge Map)
(0)115 951 5151
Notes
Fitted under Midlands PiP
Getting there
Behind Aerospace Building Visitor or Staff Parking Permit required

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Nottingham University Jubillee Campus ATC 1?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at Nottingham University Jubillee Campus ATC 1?

Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.

How many charging sockets does Nottingham University Jubillee Campus ATC 1 have?

4 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.

Where is the nearest charger with 50 kW or more to Nottingham University Jubillee Campus ATC 1?

Faraday Road (BP Pulse) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Nottingham University Jubillee Campus ATC 1?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Nottingham University Jubillee Campus ATC 1?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Nottingham University Jubillee Campus ATC 1?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 17 Jul 2019

Amp Map does not take payment. You pay the operator.