# Oberoi

Web page: https://ampmap.co.uk/charger/oberoi-3-uk

Oberoi is an EV charging site in Derby, run by Oberoi and open 24 hours a day. All 3 of its sockets are 22 kW Type 2. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 10 charging sessions here over the last 30 days.

## Status

3 of 3 open at 22 Nov 2026, 12:31 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** 20, DE24 8JY
- **Area:** Derby, United Kingdom
- **Coordinates (latitude, longitude):** 52.91235, -1.45178

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 3 | Not listed | 3 free |

## Site information

- **Operator:** Oberoi
- **Opening hours:** Open 24 hours
- **Payment:** In the operator's app; RFID card

## Common questions

### How fast is charging at Oberoi?

Up to 22 kW AC via Type 2.

### How many charging sockets does Oberoi have?

3 charging sockets: 3 × 22 kW Type 2. Live per-socket availability is shown on this page.

### Is Oberoi open 24/7?

Yes - Oberoi is open 24 hours a day, 7 days a week.

### When is Oberoi busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Oberoi?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 10 observed charging sessions.

### Who operates Oberoi?

Oberoi is on the Oberoi network.

### How long does a Tesla Model Y Long Range take to charge at Oberoi?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oberoi?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Oberoi?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Derby](https://ampmap.co.uk/chargers/united-kingdom/derby/derby)
- [Cheapest charging in Derby](https://ampmap.co.uk/chargers/united-kingdom/derby/derby/cheapest)
- [Oberoi chargers](https://ampmap.co.uk/networks/oberoi)

## Chargers near this site

- [Oberoi](https://ampmap.co.uk/charger/oberoi-2-uk) - Type 2 22 kW · 19 St Christopher's Way
- [Oberoi](https://ampmap.co.uk/charger/oberoi-uk) - Type 2 22 kW · 15
- [Merlin (Derby) · evyve](https://ampmap.co.uk/charger/evyve-merlin-derby-uk) - CCS 300 kW · 1 Orient Way · From 85p/kWh
- [EG Group Pride Park · ChargePoint](https://ampmap.co.uk/charger/chargepoint-eg-group-pride-park-uk) - Type 2 175 kW, CHAdeMO 75 kW · Murdoch Road
- [Pride Park Park-&-ride, Derby · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-pride-park-park-and-ride-derby-uk) - Type 2 7 kW · Pride Park Park
- [Derby Pride Park & Ride Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-derby-pride-park-and-ride-car-park-uk) - CCS 50 kW, Type 2 7 kW · Derby Pride Park & Ride Car Park · From 65p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/oberoi-3-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Oberoi (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
