Osprey Charging · EV charging site
Lidl Glasgow Road, Barrhead
Corsemilll Place, Barrhead, G78 1FQ
Lidl Glasgow Road, Barrhead is an EV charging site in Barrhead, East Renfrewshire, run by Osprey Charging and open 24 hours a day. Its 9 sockets reach up to 200 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 100% uptime and recorded 965 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Cochrane Street Car Park, Barrhead (Chargeplace Scotland), 0.9 miles away.
Status
9 of 9 available
Checking status…
Connectors
CCS · 200 kW
CHAdeMO · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Osprey Charging
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- Bank card at the chargerIn the Osprey appRFID card
- Charger ID
- 30038-2
- Getting there
- No Parking Restrictions No Height Restriction No Customer Input Required
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 200 kW | 89p per kWh |
| CHAdeMO | 50 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Lidl Glasgow Road, Barrhead (Osprey Charging)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Lidl Glasgow Road, Barrhead (Osprey Charging)?
Up to 200 kW DC via CCS, CHAdeMO.
How many charging sockets does Lidl Glasgow Road, Barrhead (Osprey Charging) have?
9 charging sockets: 8 × 200 kW CCS, 1 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.
Is Lidl Glasgow Road, Barrhead (Osprey Charging) open 24/7?
Yes - Lidl Glasgow Road, Barrhead (Osprey Charging) is open 24 hours a day, 7 days a week.
When is Lidl Glasgow Road, Barrhead (Osprey Charging) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Lidl Glasgow Road, Barrhead (Osprey Charging)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 965 observed charging sessions.
Who operates Lidl Glasgow Road, Barrhead?
Lidl Glasgow Road, Barrhead is on the Osprey Charging network.
Where is the nearest other charger with 50 kW or more to Lidl Glasgow Road, Barrhead (Osprey Charging)?
Cochrane Street Car Park, Barrhead (Chargeplace Scotland) is 0.9 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Lidl Glasgow Road, Barrhead (Osprey Charging)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Lidl Glasgow Road, Barrhead (Osprey Charging)?
A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Lidl Glasgow Road, Barrhead (Osprey Charging)?
A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Barrhead Sports Centre
- Water Road, Barrhead
- Cochrane Street Car Park, Barrhead
- DRAX00132
- Pod Point Tesco Superstore - Glasgow Barrhead
- Macklin Motors Nissan Glasgow
- Cheapest nearby
- Pod Point Tesco Superstore - Glasgow Barrhead · 44.4p per kWh · 7 kW · 1.1 mi