Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Osprey Charging · EV charging site

Castle Inn, Pevensey

72 Eastbourne Road, Pevensey Bay, BN24 6HS

Castle Inn, Pevensey is an EV charging site in Eastbourne, East Sussex, run by Osprey Charging and open 24 hours a day. Its 4 sockets reach up to 75 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 94% uptime and recorded 108 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Pevensey SF Connect (BP Pulse), 0.8 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from Osprey’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW2 connectors · 89p per kWh2 free
#2100% reliabilityAvailable
#4100% reliabilityAvailable
CHAdeMO · 50 kW2 connectors · 89p per kWh2 free
#188% reliabilityAvailable
#388% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Osprey appRFID card
Getting there
No Parking Restrictions No Height Restriction No Customer Input Required

Facilities

RestaurantHotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS75 kW89p per kWh
CHAdeMO50 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Castle Inn, Pevensey (Osprey Charging)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Castle Inn, Pevensey (Osprey Charging)?

Up to 75 kW DC via CCS, CHAdeMO.

How many charging sockets does Castle Inn, Pevensey (Osprey Charging) have?

4 charging sockets: 2 × 75 kW CCS, 2 × 50 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Castle Inn, Pevensey (Osprey Charging) open 24/7?

Yes - Castle Inn, Pevensey (Osprey Charging) is open 24 hours a day, 7 days a week.

When is Castle Inn, Pevensey (Osprey Charging) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Castle Inn, Pevensey (Osprey Charging)?

Amp Map measured 94% uptime here from recorded live status over the last 30 days, across 108 observed charging sessions.

Who operates Castle Inn, Pevensey?

Castle Inn, Pevensey is on the Osprey Charging network.

Where is the nearest other charger with 50 kW or more to Castle Inn, Pevensey (Osprey Charging)?

Pevensey SF Connect (BP Pulse) is 0.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Castle Inn, Pevensey (Osprey Charging)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Castle Inn, Pevensey (Osprey Charging)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Castle Inn, Pevensey (Osprey Charging)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.