Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Osprey Charging · EV charging site

Co-op Sizewell Road, Leiston

Sizewell Road, Leiston, IP16 4AE

Co-op Sizewell Road, Leiston is an EV charging site in Leiston, Suffolk, run by Osprey Charging and open 24 hours a day. All 4 of its sockets are 150 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 457 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Friday Street Farm Shop (InstaVolt Ltd), 4.8 miles away.

Status

3 of 4 available

Checking status…

VerifiedLive status and details from Osprey’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 150 kW4 connectors · 89p per kWh3 free1 in use
#1100% reliabilityAvailable
#2100% reliabilityCharging
OSP30556-1100% reliabilityAvailable
OSP30556-2100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Osprey appRFID card
Charger ID
OSP30556-1
Getting there
2 hours free parking - no return within 1 hour No Height Restriction No Customer Input Required

Facilities

SupermarketRestaurant

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS150 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Co-op Sizewell Road, Leiston (Osprey Charging)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Co-op Sizewell Road, Leiston (Osprey Charging)?

Up to 150 kW DC via CCS.

How many charging sockets does Co-op Sizewell Road, Leiston (Osprey Charging) have?

4 charging sockets: 4 × 150 kW CCS. Live per-socket availability is shown on this page.

Is Co-op Sizewell Road, Leiston (Osprey Charging) open 24/7?

Yes - Co-op Sizewell Road, Leiston (Osprey Charging) is open 24 hours a day, 7 days a week.

When is Co-op Sizewell Road, Leiston (Osprey Charging) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Co-op Sizewell Road, Leiston (Osprey Charging)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 457 observed charging sessions.

Who operates Co-op Sizewell Road, Leiston?

Co-op Sizewell Road, Leiston is on the Osprey Charging network.

Where is the nearest other charger with 50 kW or more to Co-op Sizewell Road, Leiston (Osprey Charging)?

Friday Street Farm Shop (InstaVolt Ltd) is 4.8 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Co-op Sizewell Road, Leiston (Osprey Charging)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Co-op Sizewell Road, Leiston (Osprey Charging)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Co-op Sizewell Road, Leiston (Osprey Charging)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.