Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Osprey Charging · EV charging site

164 Old Road, Clacton

162-164 Old Road, Clacton-on-Sea, CO15 3AY

164 Old Road, Clacton is an EV charging site in Clacton-on-Sea, Essex, run by Osprey Charging and open 24 hours a day. Its 6 sockets reach up to 22 kW, with Type 2 at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 68% uptime and recorded 21 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is MorrisonsOwn (GeniePoint), 0.3 miles away.

Status

6 of 6 available

Checking status…

VerifiedLive status and details from Osprey’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 22 kW4 connectors · 89p per kWh4 free
#1100% reliabilityAvailable
#2100% reliabilityAvailable
#3100% reliabilityAvailable
#4100% reliabilityAvailable
Type 2 · 7 kW2 connectors · 89p per kWh2 free
#5100% reliabilityAvailable
#6100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Getting there
No Parking Restrictions 1.98m Height Restriction

Facilities

Supermarket

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW89p per kWh
Type 27 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at 164 Old Road, Clacton (Osprey Charging)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at 164 Old Road, Clacton (Osprey Charging)?

Up to 22 kW AC via Type 2.

How many charging sockets does 164 Old Road, Clacton (Osprey Charging) have?

6 charging sockets: 2 × 7 kW Type 2, 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is 164 Old Road, Clacton (Osprey Charging) open 24/7?

Yes - 164 Old Road, Clacton (Osprey Charging) is open 24 hours a day, 7 days a week.

When is 164 Old Road, Clacton (Osprey Charging) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is 164 Old Road, Clacton (Osprey Charging)?

Amp Map measured 68% uptime here from recorded live status over the last 30 days, across 21 observed charging sessions.

Who operates 164 Old Road, Clacton?

164 Old Road, Clacton is on the Osprey Charging network.

Where is the nearest charger with 50 kW or more to 164 Old Road, Clacton (Osprey Charging)?

MorrisonsOwn (GeniePoint) is 0.3 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at 164 Old Road, Clacton (Osprey Charging)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 164 Old Road, Clacton (Osprey Charging)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at 164 Old Road, Clacton (Osprey Charging)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.