Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Osprey Charging · EV charging site

Eastham Point, Birkenhead

New Chester Road, Eastham, Garston, CH62 8HJ

Eastham Point, Birkenhead is an EV charging site in Garston, Liverpool, run by Osprey Charging and open 24 hours a day. All 6 of its sockets are 300 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 581 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Bromborough (Wirral) (evyve), 1.1 miles away.

Status

5 of 6 available

Checking status…

VerifiedLive status and details from Osprey’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 300 kW6 connectors · 89p per kWh5 free1 in use
30974-1100% reliabilityAvailable
30974-2100% reliabilityCharging
30974-3100% reliabilityAvailable
30974-4100% reliabilityAvailable
30974-5100% reliabilityAvailable
30974-6100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Parking
Car park
Payment
Bank card at the chargerIn the Osprey appRFID card
Charger ID
30974-1
Getting there
No Parking Restrictions Barrier to site No Height Restriction No Customer Input Required

Facilities

SupermarketCaféRestaurant

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS300 kW89p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£36

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Eastham Point, Birkenhead (Osprey Charging)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Eastham Point, Birkenhead (Osprey Charging)?

Up to 300 kW DC via CCS.

How many charging sockets does Eastham Point, Birkenhead (Osprey Charging) have?

6 charging sockets: 6 × 300 kW CCS. Live per-socket availability is shown on this page.

Is Eastham Point, Birkenhead (Osprey Charging) open 24/7?

Yes - Eastham Point, Birkenhead (Osprey Charging) is open 24 hours a day, 7 days a week.

When is Eastham Point, Birkenhead (Osprey Charging) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Eastham Point, Birkenhead (Osprey Charging)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 581 observed charging sessions.

Who operates Eastham Point, Birkenhead?

Eastham Point, Birkenhead is on the Osprey Charging network.

Where is the nearest other charger with 50 kW or more to Eastham Point, Birkenhead (Osprey Charging)?

Bromborough (Wirral) (evyve) is 1.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Eastham Point, Birkenhead (Osprey Charging)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Eastham Point, Birkenhead (Osprey Charging)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Eastham Point, Birkenhead (Osprey Charging)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Osprey · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.