# Maltings Retail Park, Newark · Osprey Charging

Web page: https://ampmap.co.uk/charger/osprey-charging-the-maltings-retail-park-uk

Maltings Retail Park, Newark is an EV charging site in Newark on Trent, Nottinghamshire, run by Osprey Charging and open 24 hours a day. All 4 of its sockets are 150 kW CCS, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 8 am, and Amp Map measured 100% uptime and recorded 701 charging sessions here over the last 30 days.

## Status

4 of 4 open at 22 Nov 2026, 23:43 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** North Gate, NG24 1HD
- **Area:** Newark on Trent, Nottinghamshire, United Kingdom
- **Coordinates (latitude, longitude):** 53.08115, -0.80673
- **Parking:** Car park
- **Getting there:** 2 hours free parking - no return specified No Height Restriction No Customer Input Required

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 150 kW | 4 | £0.89/kWh | 4 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Osprey Charging
- **Opening hours:** Open 24 hours
- **Payment:** Bank card at the charger; In the Osprey app; RFID card
- **Facilities:** Supermarket

## Common questions

### How much does it cost to charge at Maltings Retail Park, Newark (Osprey Charging)?

The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Maltings Retail Park, Newark (Osprey Charging)?

Up to 150 kW DC via CCS.

### How many charging sockets does Maltings Retail Park, Newark (Osprey Charging) have?

4 charging sockets: 4 × 150 kW CCS. Live per-socket availability is shown on this page.

### Is Maltings Retail Park, Newark (Osprey Charging) open 24/7?

Yes - Maltings Retail Park, Newark (Osprey Charging) is open 24 hours a day, 7 days a week.

### When is Maltings Retail Park, Newark (Osprey Charging) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

### How reliable is Maltings Retail Park, Newark (Osprey Charging)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 701 observed charging sessions.

### Who operates Maltings Retail Park, Newark?

Maltings Retail Park, Newark is on the Osprey Charging network.

### How long does a Tesla Model Y Long Range take to charge at Maltings Retail Park, Newark (Osprey Charging)?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Maltings Retail Park, Newark (Osprey Charging)?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Maltings Retail Park, Newark (Osprey Charging)?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newark on Trent](https://ampmap.co.uk/chargers/united-kingdom/nottinghamshire/newark-on-trent)
- [Cheapest charging in Newark on Trent](https://ampmap.co.uk/chargers/united-kingdom/nottinghamshire/newark-on-trent/cheapest)
- [Osprey Charging chargers](https://ampmap.co.uk/networks/osprey-charging)

## Chargers near this site

- [Newark, UK · Tesla](https://ampmap.co.uk/charger/tesla-newark-uk) - CCS 250 kW · N Gate · From 23p/kWh
- [Northgate Retail Park · Be.EV](https://ampmap.co.uk/charger/be-ev-northgate-retail-park-uk) - CCS 150 kW · Trent Lane · From 89p/kWh
- [Morrisons Newark · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-newark-uk) - CHAdeMO 50 kW, Type 2 50 kW · Wm Morrison Supermarkets PLC
- [Shell Recharge EV Waitrose - Newark](https://ampmap.co.uk/charger/shell-recharge-ev-waitrose-newark-uk) - CCS / CHAdeMO 50 kW, Type 2 7 kW · Ossington Way, Newark · From 79p/kWh
- [Appleton Gate Car-Park · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-appleton-gate-car-park-newark-uk) - CCS 50 kW · 43 Appleton Gate · From 89p/kWh
- [Newark And Sherwood Council Offices · evcharge.online](https://ampmap.co.uk/charger/evcharge-online-newark-and-sherwood-council-offices-uk) - Type 2 22 kW · Great North Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/osprey-charging-the-maltings-retail-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Osprey (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
