Wenea · EV charging site
Oxford Seacourt P&R (Wenea)
Botley Road, Oxford, OX2 0HP
Oxford Seacourt P&R (Wenea) is an EV charging site in Oxford, Oxfordshire, run by Wenea. Its 10 sockets reach up to 100 kW, with CCS at the top speed, and the price is listed as £0.55/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge EV Waitrose - Oxford, 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Wenea
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.55/kWh(from Open Charge Map, 20 Nov 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Oxford Seacourt P&R (Wenea)?
The listed price is £0.55/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Oxford Seacourt P&R (Wenea)?
Up to 100 kW DC via CCS, Type 2.
How many charging sockets does Oxford Seacourt P&R (Wenea) have?
10 charging sockets: 2 × 100 kW CCS, 8 × 22 kW Type 2.
Who operates Oxford Seacourt P&R (Wenea)?
Oxford Seacourt P&R (Wenea) is on the Wenea network.
Where is the nearest other charger with 50 kW or more to Oxford Seacourt P&R (Wenea)?
Shell Recharge EV Waitrose - Oxford is 0.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Oxford Seacourt P&R (Wenea)?
A typical 10–80% rapid charge takes about 36 min on the 100 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Oxford Seacourt P&R (Wenea)?
A typical 10–80% rapid charge takes about 29 min on the 100 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Oxford Seacourt P&R (Wenea)?
A typical 10–80% rapid charge takes about 43 min on the 100 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Shell Recharge EV Waitrose - Oxford
- Rewley Road 2
- Dcca Station 1
- Westgate - Underground
- Old Greyfriars
- The Randolph Hotel
- Cheapest nearby
- Shell Recharge EV Waitrose - Oxford · 79p per kWh · 120 kW · 0.4 mi
- Fastest nearby
- Shell Recharge EV Waitrose - Oxford · 120 kW · 0.4 mi