Pod Point · EV charging site
Pod Point Aldi Retail Park - Leeds
Tunstall Road, Leeds, LS11 5JS
Pod Point Aldi Retail Park - Leeds is an EV charging site in Leeds, City and Borough of Leeds, run by Pod Point. Its 4 sockets reach up to 7 kW, with Type 2 at the top speed, and the published price is £0.25 per kWh. Amp Map measured 0% uptime here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Leeds, UK - Whitehouse Street (Tesla), 0.7 miles away.
Status
Out of service
Checking status…
Connectors
Type 2 · 7 kW
Type 2 · 3 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Bria-Roxy
- Getting there
- For any parking restrictions that may apply, please check relevant signage.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 25.2p per kWh |
| Type 2 | 3 kW | 25.2p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Aldi Retail Park - Leeds?
The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Aldi Retail Park - Leeds?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Aldi Retail Park - Leeds have?
4 charging sockets: 2 × 7 kW Type 2, 2 × 3 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Pod Point Aldi Retail Park - Leeds?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Aldi Retail Park - Leeds?
Pod Point Aldi Retail Park - Leeds is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Aldi Retail Park - Leeds?
Leeds, UK - Whitehouse Street (Tesla) is 0.7 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Aldi Retail Park - Leeds?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Aldi Retail Park - Leeds?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£10 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Aldi Retail Park - Leeds?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£13 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Leeds, UK - Whitehouse Street
- Crown Point Shopping Cente Car Park
- Jet - Apollo
- Ingram street car park
- Asda Head Office
- Leeds Dock 01
- Fastest nearby
- Leeds, UK - Whitehouse Street · 250 kW · 0.7 mi