Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Bon Accord Aberdeen

George Street, Aberdeen, AB25 1HZ

Pod Point Bon Accord Aberdeen is an EV charging site in Aberdeen, Aberdeen City, run by Pod Point. All 12 of its sockets are 7 kW Type 2, and the published price is £0.46 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 83% uptime and recorded 171 charging sessions here over the last 30 days. 13 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Gallowgate Car Park, Aberdeen (Chargeplace Scotland), 160 yards away.

Status

7 of 12 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW12 connectors · 45.6p per kWh7 free3 in use2 out of service
Amos-Khan0% reliabilityOut of order
Amos-Khan0% reliabilityAvailable
Arne-Luca0% reliabilityOut of order
Arne-Luca0% reliabilityCharging
Clay-Cole100% reliabilityAvailable
Clay-Cole100% reliabilityCharging
Dean-Nash100% reliabilityAvailable
Dean-Nash100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Amos-Khan

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW45.6p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£25
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£18
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£23
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£23
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£19
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£19
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£13

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Bon Accord Aberdeen?

The listed price is £0.46/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Bon Accord Aberdeen?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Bon Accord Aberdeen have?

12 charging sockets: 12 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Bon Accord Aberdeen busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Bon Accord Aberdeen?

Amp Map measured 83% uptime here from recorded live status over the last 30 days, across 171 observed charging sessions.

Who operates Pod Point Bon Accord Aberdeen?

Pod Point Bon Accord Aberdeen is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Bon Accord Aberdeen?

Gallowgate Car Park, Aberdeen (Chargeplace Scotland) is 160 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Bon Accord Aberdeen?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Bon Accord Aberdeen?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Bon Accord Aberdeen?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.