# Pod Point J Day Engineering

Web page: https://ampmap.co.uk/charger/pod-point-bow-bridge-the-marsh-uk

Pod Point J Day Engineering is an EV charging site in Yeovil, Somerset, run by Pod Point. Both of its sockets are 22 kW Type 2, and the published price is £0.46 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 9 charging sessions here over the last 30 days.

## Status

2 of 2 open at 22 Nov 2026, 16:33 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Bow Bridge, The Marsh, BA8 0TF
- **Area:** Yeovil, Somerset, United Kingdom
- **Coordinates (latitude, longitude):** 50.98630, -2.36320

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | £0.46/kWh | 2 free |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Pod Point
- **Opening hours:** Not published
- **Payment:** In the Pod Point app

## Common questions

### How much does it cost to charge at Pod Point J Day Engineering?

The listed price is £0.46/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Pod Point J Day Engineering?

Up to 22 kW AC via Type 2.

### How many charging sockets does Pod Point J Day Engineering have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

### When is Pod Point J Day Engineering busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Pod Point J Day Engineering?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 9 observed charging sessions.

### Who operates Pod Point J Day Engineering?

Pod Point J Day Engineering is on the Pod Point network.

### How long does a Tesla Model Y Long Range take to charge at Pod Point J Day Engineering?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point J Day Engineering?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Pod Point J Day Engineering?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Yeovil](https://ampmap.co.uk/chargers/united-kingdom/somerset/yeovil)
- [Cheapest charging in Yeovil](https://ampmap.co.uk/chargers/united-kingdom/somerset/yeovil/cheapest)
- [Pod Point chargers](https://ampmap.co.uk/networks/pod-point)

## Chargers near this site

- [Gibbs Marsh Depot · Be.EV](https://ampmap.co.uk/charger/be-ev-gibbs-marsh-depot-uk) - Type 2 22 kW · Gibbs Marsh Trading Estate · From 59p/kWh
- [Daisy Electric Station 1 · ChargePoint](https://ampmap.co.uk/charger/chargepoint-daisy-electric-station-1-uk) - Type 2 43 kW · Dike and Son Ring Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/pod-point-bow-bridge-the-marsh-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Pod Point (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
