# Pod Point Bride Village Car Park

Web page: https://ampmap.co.uk/charger/pod-point-bride-village-car-park-im

Pod Point Bride Village Car Park is an EV charging site in Bride, Isle of Man, run by Pod Point. Both of its sockets are 22 kW Type 2, and the published price is £0.32 per kWh. Amp Map measured 0% uptime here over the last 30 days.

## Status

Under maintenance at 22 Nov 2026, 21:45 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Bride, IM7 4AT
- **Area:** Bride, Isle of Man, United Kingdom
- **Coordinates (latitude, longitude):** 54.38215, -4.38866

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | £0.32/kWh | Out of service |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Pod Point
- **Opening hours:** Not published
- **Payment:** In the Pod Point app

## Common questions

### How much does it cost to charge at Pod Point Bride Village Car Park?

The listed price is £0.32/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Pod Point Bride Village Car Park?

Up to 22 kW AC via Type 2.

### How many charging sockets does Pod Point Bride Village Car Park have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

### How reliable is Pod Point Bride Village Car Park?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

### Who operates Pod Point Bride Village Car Park?

Pod Point Bride Village Car Park is on the Pod Point network.

### How long does a Tesla Model Y Long Range take to charge at Pod Point Bride Village Car Park?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Bride Village Car Park?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£13 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Pod Point Bride Village Car Park?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£17 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Bride](https://ampmap.co.uk/chargers/united-kingdom/isle-of-man/bride)
- [Pod Point chargers](https://ampmap.co.uk/networks/pod-point)

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/pod-point-bride-village-car-park-im)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Pod Point (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
