Pod Point · EV charging site
Pod Point Danby Lodge National Park Centre
Danby Lodge National Park Centre, Lodge Ln, Guisborough, YO21 2NB
Pod Point Danby Lodge National Park Centre is an EV charging site in Guisborough, Redcar and Cleveland, run by Pod Point. All 8 of its sockets are 7 kW Type 2, and the published price is £0.50 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 24 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is MFG Jet Rectory Lane (GeniePoint), 8 miles away.
Status
8 of 8 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Fred-Nash
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 50.4p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Danby Lodge National Park Centre?
The listed price is £0.50/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Danby Lodge National Park Centre?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Danby Lodge National Park Centre have?
8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Danby Lodge National Park Centre busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Pod Point Danby Lodge National Park Centre?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 24 observed charging sessions.
Who operates Pod Point Danby Lodge National Park Centre?
Pod Point Danby Lodge National Park Centre is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Danby Lodge National Park Centre?
MFG Jet Rectory Lane (GeniePoint) is 8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Danby Lodge National Park Centre?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Danby Lodge National Park Centre?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Danby Lodge National Park Centre?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.