Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Easthampstead Park Hotel

Off Peacock Lane, Bracknell, RG40 3DF

Pod Point Easthampstead Park Hotel is an EV charging site in Bracknell, Bracknell Forest, run by Pod Point. Both of its sockets are 7 kW Type 2, and published prices run from £0.40 to £0.46 per kWh. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 100% uptime and recorded 126 charging sessions here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Great Hollands Square (Be.EV), 0.8 miles away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW2 connectors · 45.6p per kWh2 free
Ivan-Axel100% reliabilityAvailable
Luca-Leon100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Ivan-Axel
Getting there
The chargers are located to the left side of the mansion near East Park Gym

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Prices

Price times

RateHoursPriceCurrent
Off-peak00:00–07:00£0.40/kWh
Peak07:00–22:00£0.46/kWh
Off-peak22:00–00:00£0.40/kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£25
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£18
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£23
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£23
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£19
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£19
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£13

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Easthampstead Park Hotel?

The listed price is £0.40–£0.46/kWh · varies by time of day. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Easthampstead Park Hotel?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Easthampstead Park Hotel have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Easthampstead Park Hotel busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 1 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Easthampstead Park Hotel?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 126 observed charging sessions.

Who operates Pod Point Easthampstead Park Hotel?

Pod Point Easthampstead Park Hotel is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Easthampstead Park Hotel?

Great Hollands Square (Be.EV) is 0.8 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Easthampstead Park Hotel?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Easthampstead Park Hotel?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Easthampstead Park Hotel?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.