Pod Point · EV charging site
Pod Point Forest of Arden Marriott Hotel & Country Club
Maxstoke Lane Meriden, Solihull, CV7 7HR
Pod Point Forest of Arden Marriott Hotel & Country Club is an EV charging site in Solihull, run by Pod Point. All 4 of its sockets are 22 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 6 am, and Amp Map measured 100% uptime and recorded 203 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Blue Diamond Melbicks (Be.EV), 1.8 miles away.
Status
4 of 4 available
Checking status…
Connectors
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Hans-Aida
- Getting there
- For any parking restrictions that may apply, please check relevant signage.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 22 kW | 64.8p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Forest of Arden Marriott Hotel & Country Club?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Forest of Arden Marriott Hotel & Country Club?
Up to 22 kW AC via Type 2.
How many charging sockets does Pod Point Forest of Arden Marriott Hotel & Country Club have?
4 charging sockets: 4 × 22 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Forest of Arden Marriott Hotel & Country Club busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 6 am and quietest around 1 pm. The live status on this page shows what is free before you set off.
How reliable is Pod Point Forest of Arden Marriott Hotel & Country Club?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 203 observed charging sessions.
Who operates Pod Point Forest of Arden Marriott Hotel & Country Club?
Pod Point Forest of Arden Marriott Hotel & Country Club is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Forest of Arden Marriott Hotel & Country Club?
Blue Diamond Melbicks (Be.EV) is 1.8 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Forest of Arden Marriott Hotel & Country Club?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Forest of Arden Marriott Hotel & Country Club?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Forest of Arden Marriott Hotel & Country Club?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Blue Diamond Melbicks
- NEC EV Park & Charge
- NEC Ultrafast Charging Hub
- National Motorcycle Museum
- Diamond Office
- NEC Express Parking 1
- Fastest nearby
- NEC Ultrafast Charging Hub · 300 kW · 2.3 mi