Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point George & Dragon Westerham

Market Square Westerham, Sevenoaks, TN16 1AW

Pod Point George & Dragon Westerham is an EV charging site in Sevenoaks, Kent, run by Pod Point. All 4 of its sockets are 7 kW Type 2, and the published price is £0.50 per kWh. Recorded live status shows it is usually busiest around 5 pm, and Amp Map measured 55% uptime and recorded 15 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is EH - Roadchef Clacket Lane Westbound (GRIDSERVE), 1.3 miles away.

Status

1 of 4 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 7 kW4 connectors · 50.4p per kWh1 free2 out of service1 status unknown
Emry-Nina0% reliabilityAvailable
Emry-Nina0% reliabilityOut of order
Finn-Rudy30% reliabilityStatus unknown
Finn-Rudy30% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Emry-Nina

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW50.4p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£28
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£20
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£26
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£26
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£22
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£20
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£14

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point George & Dragon Westerham?

The listed price is £0.50/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point George & Dragon Westerham?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point George & Dragon Westerham have?

4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point George & Dragon Westerham busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 5 pm and quietest around 2 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point George & Dragon Westerham?

Amp Map measured 55% uptime here from recorded live status over the last 30 days, across 15 observed charging sessions.

Who operates Pod Point George & Dragon Westerham?

Pod Point George & Dragon Westerham is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point George & Dragon Westerham?

EH - Roadchef Clacket Lane Westbound (GRIDSERVE) is 1.3 miles away in a straight line, with up to 237 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point George & Dragon Westerham?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point George & Dragon Westerham?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point George & Dragon Westerham?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.