Pod Point · EV charging site
Pod Point Heacham Manor Hotel
Hunstanton Road Heacham, King's Lynn, PE31 7JX
Pod Point Heacham Manor Hotel is an EV charging site in King's Lynn, Norfolk, run by Pod Point. Its 6 sockets reach up to 22 kW, with Type 2 at the top speed, and published prices run from £0.44 to £0.55 per kWh. Recorded live status shows it is usually busiest around 8 pm, and Amp Map measured 83% uptime and recorded 75 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Central Car Park (BP Pulse), 1.4 miles away.
Status
4 of 6 available
Checking status…
Connectors
Type 2 · 22 kW
Type 2 · 11 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Clay-Arne
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 22 kW | 55.2p per kWh |
| Type 2 | 11 kW | 44.4p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Heacham Manor Hotel?
The listed price is Type 2 £0.44/kWh · Type 2 £0.55/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Heacham Manor Hotel?
Up to 22 kW AC via Type 2.
How many charging sockets does Pod Point Heacham Manor Hotel have?
6 charging sockets: 4 × 11 kW Type 2, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Heacham Manor Hotel busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 11 am. The live status on this page shows what is free before you set off.
How reliable is Pod Point Heacham Manor Hotel?
Amp Map measured 83% uptime here from recorded live status over the last 30 days, across 75 observed charging sessions.
Who operates Pod Point Heacham Manor Hotel?
Pod Point Heacham Manor Hotel is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Heacham Manor Hotel?
Central Car Park (BP Pulse) is 1.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Heacham Manor Hotel?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Heacham Manor Hotel?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Heacham Manor Hotel?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.