Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Hochtief Murphy Joint Venture

Old Kent Road, Southwark, Peckham, SE15 1JZ

Pod Point Hochtief Murphy Joint Venture is an EV charging site in Peckham, Greater London, run by Pod Point. Its 6 sockets reach up to 22 kW, with Type 2 at the top speed, and the published price is £0.35 per kWh. Recorded live status shows it is usually busiest around 8 am, and Amp Map measured 65% uptime and recorded 20 charging sessions here over the last 30 days. 406 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Old Kent Road (InstaVolt Ltd), 0.4 miles away.

Status

3 of 6 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

Type 2 · 22 kW4 connectors · 34.8p per kWh2 free1 out of service1 status unknown
Fran-Neil0% reliabilityStatus unknown
Fran-Neil0% reliabilityOut of order
Frey-Otis100% reliabilityAvailable
Frey-Otis100% reliabilityAvailable
Type 2 · 7 kW2 connectors · 34.8p per kWh1 free1 out of service
Mark-Andy0% reliabilityAvailable
Mark-Andy0% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Fran-Neil

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW34.8p per kWh
Type 27 kW34.8p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£19
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£14
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£18
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£18
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£15
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£14
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£9.74

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Hochtief Murphy Joint Venture?

The listed price is £0.35/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Hochtief Murphy Joint Venture?

Up to 22 kW AC via Type 2.

How many charging sockets does Pod Point Hochtief Murphy Joint Venture have?

6 charging sockets: 2 × 7 kW Type 2, 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Hochtief Murphy Joint Venture busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 8 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Hochtief Murphy Joint Venture?

Amp Map measured 65% uptime here from recorded live status over the last 30 days, across 20 observed charging sessions.

Who operates Pod Point Hochtief Murphy Joint Venture?

Pod Point Hochtief Murphy Joint Venture is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Hochtief Murphy Joint Venture?

McDonald's Old Kent Road (InstaVolt Ltd) is 0.4 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Hochtief Murphy Joint Venture?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£19 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Hochtief Murphy Joint Venture?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Hochtief Murphy Joint Venture?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.