Pod Point · EV charging site
Pod Point Hurst Grid Substation Site
Haul Road, Bexley, DA5 3ND
Pod Point Hurst Grid Substation Site is an EV charging site in Bexley, Greater London, run by Pod Point. Its 4 sockets reach up to 22 kW, with Type 2 at the top speed, and the published price is £0.35 per kWh. Amp Map measured 0% uptime here over the last 30 days. 17 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sainsbury's Crayford, 1.5 miles away.
Status
Out of service
Checking status…
Connectors
Type 2 · 22 kW
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Aida-June
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 22 kW | 34.8p per kWh |
| Type 2 | 7 kW | 34.8p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Hurst Grid Substation Site?
The listed price is £0.35/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Hurst Grid Substation Site?
Up to 22 kW AC via Type 2.
How many charging sockets does Pod Point Hurst Grid Substation Site have?
4 charging sockets: 2 × 22 kW Type 2, 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
How reliable is Pod Point Hurst Grid Substation Site?
Amp Map measured 0% uptime here from recorded live status over the last 30 days.
Who operates Pod Point Hurst Grid Substation Site?
Pod Point Hurst Grid Substation Site is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Hurst Grid Substation Site?
Sainsbury's Crayford is 1.5 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Hurst Grid Substation Site?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£19 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Hurst Grid Substation Site?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Hurst Grid Substation Site?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.