Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point National Trust Holiday Cottages - Oast House

The Oast House Brockhampton, Great Malvern, WR6 5SH

Pod Point National Trust Holiday Cottages - Oast House is an EV charging site in Great Malvern, Worcestershire, run by Pod Point. All 3 of its sockets are 7 kW Type 2, and charging is listed as free. Recorded live status shows it is usually busiest around 6 pm, and Amp Map measured 100% uptime and recorded 29 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is MFG (GeniePoint), 8.2 miles away.

Status

3 of 3 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW3 connectors · Free per kWh3 free
Gael-Witt100% reliabilityAvailable
Orla-John100% reliabilityAvailable
Reef-Tina100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Gael-Witt
Getting there
Not for Public Use The chargers are reserved for GUESTS ONLY

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kWFree per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£0.00
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£0.00
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£0.00
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£0.00
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£0.00
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£0.00
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£0.00

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point National Trust Holiday Cottages - Oast House?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point National Trust Holiday Cottages - Oast House?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point National Trust Holiday Cottages - Oast House have?

3 charging sockets: 3 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point National Trust Holiday Cottages - Oast House busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 pm and quietest around 1 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point National Trust Holiday Cottages - Oast House?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 29 observed charging sessions.

Who operates Pod Point National Trust Holiday Cottages - Oast House?

Pod Point National Trust Holiday Cottages - Oast House is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point National Trust Holiday Cottages - Oast House?

MFG (GeniePoint) is 8.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point National Trust Holiday Cottages - Oast House?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point National Trust Holiday Cottages - Oast House?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point National Trust Holiday Cottages - Oast House?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.