Pod Point · EV charging site
Pod Point North Bank
North Bank, Ammanford, SA19 6AP
Pod Point North Bank is an EV charging site in Ammanford, Carmarthenshire, run by Pod Point. Both of its sockets are 22 kW Type 2, and charging is listed as free. Recorded live status shows it is usually busiest around noon, and Amp Map measured 100% uptime and recorded 1 charging session here over the last 30 days. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Cross Hands EV Hub (POGO), 7.2 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 22 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Jess-Hope
- Getting there
- Very busy 7am-7pm Monday-Friday. Please ideally only use on Saturday & Sundays (price reflects this). Unsuitable for trailers
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 22 kW | Free per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point North Bank?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point North Bank?
Up to 22 kW AC via Type 2.
How many charging sockets does Pod Point North Bank have?
2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point North Bank busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Pod Point North Bank?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.
Who operates Pod Point North Bank?
Pod Point North Bank is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point North Bank?
Cross Hands EV Hub (POGO) is 7.2 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point North Bank?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point North Bank?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point North Bank?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.