Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Oaklands House

Old Oak Common road, Harlesden, NW10 6DX

Pod Point Oaklands House is an EV charging site in Harlesden, Greater London, run by Pod Point. All 6 of its sockets are 7 kW Type 2, and charging is listed as free. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 96 charging sessions here over the last 30 days. 244 other charging sites are listed within a mile, and the nearest site with 50 kW or more is 29 Station Road, 0.5 miles away.

Status

4 of 6 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW6 connectors · Free per kWh4 free1 in use1 status unknown
Aldo-Mack100% reliabilityAvailable
Amir-Todd100% reliabilityAvailable
Dion-Chad100% reliabilityAvailable
Lara-Lola100% reliabilityCharging
Lily-Yoko100% reliabilityStatus unknown
Zane-Jane100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Aldo-Mack

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kWFree per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£0.00
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£0.00
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£0.00
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£0.00
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£0.00
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£0.00
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£0.00

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Oaklands House?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Oaklands House?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Oaklands House have?

6 charging sockets: 6 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Oaklands House busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 3 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Oaklands House?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 96 observed charging sessions.

Who operates Pod Point Oaklands House?

Pod Point Oaklands House is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Oaklands House?

29 Station Road is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Oaklands House?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Oaklands House?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Oaklands House?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£0.00 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.