Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Premier Inn - Seaton

Harbour Road Seaton, EX12 2NA

Pod Point Premier Inn - Seaton is an EV charging site in Seaton, Devon, run by Pod Point. Both of its sockets are 3 kW Type 2, and the published price is £0.44 per kWh. Recorded live status shows it is usually busiest around 6 am, and Amp Map measured 49% uptime and recorded 25 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Town Centre Car Park (Wenea), 1.4 miles away.

Status

0 of 2 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 3 kW2 connectors · 44.4p per kWh1 in use1 out of service
Dawn-Lary0% reliabilityCharging
Dawn-Lary0% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Dawn-Lary
Getting there
For any parking restrictions that may apply, please check relevant signage.

Facilities

Hotel / inn

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 23 kW44.4p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 3 kW Type 2~18h 26m · ≈ 55 kWh · ~£25
Tesla Model 3 Rear-Wheel Drive 10–80% · 3 kW Type 2~13h 18m · ≈ 40 kWh · ~£18
Audi Q4 e-tron 50 10–80% · 3 kW Type 2~17h 2m · ≈ 51 kWh · ~£23
Hyundai IONIQ 5 10–80% · 3 kW Type 2~16h 56m · ≈ 51 kWh · ~£23
MG Motor MG4 Trophy 10–80% · 3 kW Type 2~14h 14m · ≈ 43 kWh · ~£19
Hyundai Kona Electric Long Range 10–80% · 3 kW Type 2~13h 32m · ≈ 41 kWh · ~£18
Nissan LEAF 10–80% · 3 kW Type 2~9h 20m · ≈ 28 kWh · ~£12

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Premier Inn - Seaton?

The listed price is £0.44/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Premier Inn - Seaton?

Up to 3 kW AC via Type 2.

How many charging sockets does Pod Point Premier Inn - Seaton have?

2 charging sockets: 2 × 3 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Premier Inn - Seaton busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 6 am and quietest around noon. The live status on this page shows what is free before you set off.

How reliable is Pod Point Premier Inn - Seaton?

Amp Map measured 49% uptime here from recorded live status over the last 30 days, across 25 observed charging sessions.

Who operates Pod Point Premier Inn - Seaton?

Pod Point Premier Inn - Seaton is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Premier Inn - Seaton?

Town Centre Car Park (Wenea) is 1.4 miles away in a straight line, with up to 60 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Premier Inn - Seaton?

A 10–80% charge takes about 18h 26m on the 3 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Premier Inn - Seaton?

A 10–80% charge takes about 13h 18m on the 3 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Premier Inn - Seaton?

A 10–80% charge takes about 17h 2m on the 3 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.