Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Quintin Hogg Memorial Ground

Quintin Hogg River Gate pitches Quintin Lane, Barnes, W4 3UD

Pod Point Quintin Hogg Memorial Ground is an EV charging site in Barnes, Greater London, run by Pod Point. All 10 of its sockets are 7 kW Type 2, and the published price is £0.48 per kWh. Recorded live status shows it is usually busiest around 8 am, and Amp Map measured 100% uptime and recorded 75 charging sessions here over the last 30 days. 219 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lower Richmond Road by Bicester Road (ESB Energy), 0.7 miles away.

Status

8 of 10 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW10 connectors · 48p per kWh8 free2 in use
Bert-Lena100% reliabilityAvailable
Bert-Lena100% reliabilityCharging
Cory-Edna100% reliabilityAvailable
Cory-Edna100% reliabilityAvailable
Joel-Iris100% reliabilityAvailable
Joel-Iris100% reliabilityAvailable
Luca-Jess100% reliabilityAvailable
Luca-Jess100% reliabilityAvailable
Zena-Myla100% reliabilityAvailable
Zena-Myla100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Bert-Lena
Getting there
Parking charges apply at this venue. Please see notices displayed within the car park for information and charges.

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW48p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£27
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£19
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£25
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£24
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£20
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£19
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£13

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Quintin Hogg Memorial Ground?

The listed price is £0.48/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Quintin Hogg Memorial Ground?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Quintin Hogg Memorial Ground have?

10 charging sockets: 10 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Quintin Hogg Memorial Ground busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Quintin Hogg Memorial Ground?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 75 observed charging sessions.

Who operates Pod Point Quintin Hogg Memorial Ground?

Pod Point Quintin Hogg Memorial Ground is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Quintin Hogg Memorial Ground?

Lower Richmond Road by Bicester Road (ESB Energy) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Quintin Hogg Memorial Ground?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Quintin Hogg Memorial Ground?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£19 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Quintin Hogg Memorial Ground?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.