Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Ridgeway property holdings LTD

The Ridgeway, Finchley, NW7 1RP

Pod Point Ridgeway property holdings LTD is an EV charging site in Finchley, Greater London, run by Pod Point. Both of its sockets are 22 kW Type 2, and the published price is £0.60 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 100% uptime and recorded 3 charging sessions here over the last 30 days. 9 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] Mill Hill East Station Car Park (BP Pulse), 0.4 miles away.

Status

2 of 2 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW2 connectors · 60p per kWh2 free
Alec-Cole100% reliabilityAvailable
Faye-Gina100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Alec-Cole
Getting there
This is a private premises and chargers are to be used by authorised personnel only.

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW60p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£31
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£26
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Ridgeway property holdings LTD?

The listed price is £0.60/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Ridgeway property holdings LTD?

Up to 22 kW AC via Type 2.

How many charging sockets does Pod Point Ridgeway property holdings LTD have?

2 charging sockets: 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Ridgeway property holdings LTD busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 10 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Ridgeway property holdings LTD?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 3 observed charging sessions.

Who operates Pod Point Ridgeway property holdings LTD?

Pod Point Ridgeway property holdings LTD is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Ridgeway property holdings LTD?

[E-TAXI ONLY] Mill Hill East Station Car Park (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Ridgeway property holdings LTD?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Ridgeway property holdings LTD?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Ridgeway property holdings LTD?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£31 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.