Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Rushden Lakes

Rushden, NN10 6FH

Pod Point Rushden Lakes is an EV charging site in Rushden, North Northamptonshire, run by Pod Point. Its 16 sockets reach up to 22 kW, with Type 2 at the top speed, and the published price is £0.44 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 78% uptime and recorded 1012 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Bannatynes Health Club - Wellingborough (InstaVolt Ltd), 4.6 miles away.

Status

3 of 16 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW4 connectors · 44.4p per kWh1 free1 in use2 out of service
Gabe-Tess0% reliabilityOut of order
Gabe-Tess0% reliabilityOut of order
Toby-Paul100% reliabilityAvailable
Toby-Paul100% reliabilityCharging
Type 2 · 7 kW12 connectors · 44.4p per kWh2 free8 in use2 out of service
Abel-Clay100% reliabilityCharging
Abel-Clay100% reliabilityAvailable
Alec-Scot100% reliabilityCharging
Alec-Scot100% reliabilityCharging
Beck-Sage100% reliabilityCharging
Beck-Sage100% reliabilityCharging
Bing-Yoko100% reliabilityCharging
Bing-Yoko100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Abel-Clay

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW44.4p per kWh
Type 27 kW44.4p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£25
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£18
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£23
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£23
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£19
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£18
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£12

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Rushden Lakes?

The listed price is £0.44/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Rushden Lakes?

Up to 22 kW AC via Type 2.

How many charging sockets does Pod Point Rushden Lakes have?

16 charging sockets: 12 × 7 kW Type 2, 4 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Rushden Lakes busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point Rushden Lakes?

Amp Map measured 78% uptime here from recorded live status over the last 30 days, across 1012 observed charging sessions.

Who operates Pod Point Rushden Lakes?

Pod Point Rushden Lakes is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Rushden Lakes?

Bannatynes Health Club - Wellingborough (InstaVolt Ltd) is 4.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Rushden Lakes?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Rushden Lakes?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Rushden Lakes?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.