# Pod Point Safford Park

Web page: https://ampmap.co.uk/charger/pod-point-safford-park-2-uk

Pod Point Safford Park is an EV charging site in Seaford, East Sussex, run by Pod Point. All 4 of its sockets are 7 kW Type 2, and the published price is £0.28 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 31 charging sessions here over the last 30 days.

## Status

3 of 4 open at 22 Nov 2026, 17:26 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Valentine House, 1 Parker Drive Newhaven, BN9 0FH
- **Area:** Seaford, East Sussex, United Kingdom
- **Coordinates (latitude, longitude):** 50.80243, 0.05878
- **Getting there:** This car charging point should only be used by residents and visitors of Safford Park. Please do not park in the car charging bay if you do not intend to use the Pod Point. Thank you.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 7 kW | 4 | £0.28/kWh | 3 free, 1 status unknown |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Pod Point
- **Opening hours:** Not published
- **Payment:** In the Pod Point app

## Common questions

### How much does it cost to charge at Pod Point Safford Park?

The listed price is £0.28/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Pod Point Safford Park?

Up to 7 kW AC via Type 2.

### How many charging sockets does Pod Point Safford Park have?

4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

### When is Pod Point Safford Park busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 2 pm. The live status on this page shows what is free before you set off.

### How reliable is Pod Point Safford Park?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 31 observed charging sessions.

### Who operates Pod Point Safford Park?

Pod Point Safford Park is on the Pod Point network.

### How long does a Tesla Model Y Long Range take to charge at Pod Point Safford Park?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£15 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Safford Park?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£11 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Pod Point Safford Park?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£14 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Seaford](https://ampmap.co.uk/chargers/united-kingdom/east-sussex/seaford)
- [Pod Point chargers](https://ampmap.co.uk/networks/pod-point)

## Chargers near this site

- [Newhaven Town Centre Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-newhaven-town-centre-car-park-uk) - CCS 50 kW, CHAdeMO 50 kW · Town Centre Car Park
- [BP Peacehaven · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-bp-peacehaven-uk) - CHAdeMO 50 kW, Type 2 50 kW · 180 South Coast Road
- [Morrisons Seaford · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-seaford-uk) - CCS 50 kW, CHAdeMO 50 kW · Dane Road
- [Pod Point BEC - Rathfinny Wine Estate](https://ampmap.co.uk/charger/pod-point-bec-rathfinny-wine-estate-uk) - Type 2 7 kW · Rathfinny · From 33.6p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/pod-point-safford-park-2-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Pod Point (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
