Pod Point · EV charging site
Pod Point Sea Terminal
Sea Terminal, Douglas, IM1 2BY
Pod Point Sea Terminal is an EV charging site in Douglas, Isle of Man, run by Pod Point. Both of its sockets are 75 kW CHAdeMO and CCS, and the published price is £0.40 per kWh. 4 other charging sites are listed within a mile, and no other site with 50 kW or more is listed within 15 miles.
Status
Not reporting
Checking status…
Connectors
CCS · 75 kW
CHAdeMO · 75 kW
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- Contactless card at the chargerIn the Pod Point app
- Charger ID
- Arah-Evin
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CHAdeMO | 75 kW | 39.6p per kWh |
| CCS | 75 kW | 39.6p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Sea Terminal?
The listed price is £0.40/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Sea Terminal?
Up to 75 kW DC via CHAdeMO, CCS.
How many charging sockets does Pod Point Sea Terminal have?
2 charging sockets: 1 × 75 kW CHAdeMO, 1 × 75 kW CCS. Live per-socket availability is shown on this page.
Who operates Pod Point Sea Terminal?
Pod Point Sea Terminal is on the Pod Point network.
Where is the nearest other charger with 50 kW or more to Pod Point Sea Terminal?
Amp Map lists no other site with 50 kW or more within 15 miles in a straight line.
How long does a Tesla Model Y Long Range take to charge at Pod Point Sea Terminal?
A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Sea Terminal?
A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Sea Terminal?
A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Loch Promenade
- Pod Point Shaw’s Brow Car Park
- Pod Point Chester Street Car Park
- Pod Point Spectrum Apartments
- Pod Point Queens Promenade
- Pod Point University College IOM
- Cheapest nearby
- Pod Point Loch Promenade · 32.4p per kWh · 7 kW · 0.3 mi