# Pod Point Sea Terminal

Web page: https://ampmap.co.uk/charger/pod-point-sea-terminal-im

Pod Point Sea Terminal is an EV charging site in Douglas, Isle of Man, run by Pod Point. Both of its sockets are 75 kW CHAdeMO and CCS, and the published price is £0.40 per kWh.

## Status

Offline at 22 Nov 2026, 16:26 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Sea Terminal, IM1 2BY
- **Area:** Douglas, Isle of Man, United Kingdom
- **Coordinates (latitude, longitude):** 54.14834, -4.47443

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| CCS | 75 kW | 1 | £0.40/kWh | Status unknown |
| CHAdeMO | 75 kW | 1 | £0.40/kWh | Status unknown |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Pod Point
- **Opening hours:** Not published
- **Payment:** Contactless card at the charger; In the Pod Point app

## Common questions

### How much does it cost to charge at Pod Point Sea Terminal?

The listed price is £0.40/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Pod Point Sea Terminal?

Up to 75 kW DC via CHAdeMO, CCS.

### How many charging sockets does Pod Point Sea Terminal have?

2 charging sockets: 1 × 75 kW CHAdeMO, 1 × 75 kW CCS. Live per-socket availability is shown on this page.

### Who operates Pod Point Sea Terminal?

Pod Point Sea Terminal is on the Pod Point network.

### How long does a Tesla Model Y Long Range take to charge at Pod Point Sea Terminal?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£22 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Sea Terminal?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£16 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Pod Point Sea Terminal?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Douglas](https://ampmap.co.uk/chargers/united-kingdom/isle-of-man/douglas)
- [Pod Point chargers](https://ampmap.co.uk/networks/pod-point)

## Chargers near this site

- [Pod Point Loch Promenade](https://ampmap.co.uk/charger/pod-point-loch-promenade-im) - Type 2 7 kW · Loch Promenade · From 32.4p/kWh
- [Pod Point Shaw’s Brow Car Park](https://ampmap.co.uk/charger/pod-point-shaw-s-brow-car-park-im) - Type 2 7 kW · Church Street · From 32.4p/kWh
- [Pod Point Chester Street Car Park](https://ampmap.co.uk/charger/pod-point-chester-street-car-park-uk) - Type 2 7 kW · Douglas · From 32.4p/kWh
- [Pod Point Spectrum Apartments](https://ampmap.co.uk/charger/pod-point-spectrum-apartments) - Type 2 22 kW · Spectrum Apartments Central Promenade · From 32.4p/kWh
- [Pod Point Queens Promenade](https://ampmap.co.uk/charger/pod-point-queens-promenade) - Type 2 7 kW · Queens Promenade · From 32.4p/kWh
- [Pod Point University College IOM](https://ampmap.co.uk/charger/pod-point-university-college-iom-im) - Type 2 7 kW · Homefield Road · From 32.4p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/pod-point-sea-terminal-im)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Pod Point (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.