Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Sherwood Observatory

Coxmoor Road Sutton-in-Ashfield, Kirkby in Ashfield, NG17 5LF

Pod Point Sherwood Observatory is an EV charging site in Kirkby in Ashfield, Nottinghamshire, run by Pod Point. All 4 of its sockets are 7 kW Type 2, and the published price is £0.49 per kWh. Recorded live status shows it is usually busiest around 8 pm, and Amp Map measured 71% uptime and recorded 7 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Kings Mill Reservoir (Charge Your Car), 1 mile away.

Status

3 of 4 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW4 connectors · 49.2p per kWh3 free1 out of service
Alan-Jake100% reliabilityAvailable
Alan-Jake100% reliabilityAvailable
Cris-Yoko0% reliabilityOut of order
Cris-Yoko0% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Alan-Jake
Getting there
Please note: Chargers are only accessible during Planetarium opening hours, Entrance into the Planetarium and Science Centre building is by pre-booked ticket only, however WC's and Accessible WC's are available on entrance level for use if required.

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW49.2p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£27
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£20
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£25
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£25
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£21
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£20
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£14

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Sherwood Observatory?

The listed price is £0.49/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Sherwood Observatory?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Sherwood Observatory have?

4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point Sherwood Observatory busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 8 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Pod Point Sherwood Observatory?

Amp Map measured 71% uptime here from recorded live status over the last 30 days, across 7 observed charging sessions.

Who operates Pod Point Sherwood Observatory?

Pod Point Sherwood Observatory is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Sherwood Observatory?

Kings Mill Reservoir (Charge Your Car) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Sherwood Observatory?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Sherwood Observatory?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Sherwood Observatory?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.