Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point South Staffordshire Council

Wolverhampton Rd Codsall, WV8 1PX

Pod Point South Staffordshire Council is an EV charging site in Wolverhampton, run by Pod Point. All 12 of its sockets are 22 kW Type 2, and the published price is £0.50 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 100% uptime and recorded 422 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Claregate, Tettenhall (Osprey Charging), 2 miles away.

Status

11 of 12 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 22 kW12 connectors · 50.4p per kWh11 free1 in use
Alma-Beck100% reliabilityAvailable
Alma-Beck100% reliabilityAvailable
Cora-Sage100% reliabilityAvailable
Cora-Sage100% reliabilityAvailable
Dane-Dirk100% reliabilityAvailable
Dane-Dirk100% reliabilityAvailable
Jane-Quin100% reliabilityAvailable
Jane-Quin100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Alma-Beck

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW50.4p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£28
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£20
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£26
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£26
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£22
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£20
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£14

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger
Amp Map flagged a possible fault · socket Cora-Sage · 109 status changes in a day, with 10 charging sessions averaging 15 min, before it settled.

Common questions

How much does it cost to charge at Pod Point South Staffordshire Council?

The listed price is £0.50/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point South Staffordshire Council?

Up to 22 kW AC via Type 2.

How many charging sockets does Pod Point South Staffordshire Council have?

12 charging sockets: 12 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is Pod Point South Staffordshire Council busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Pod Point South Staffordshire Council?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 422 observed charging sessions.

Who operates Pod Point South Staffordshire Council?

Pod Point South Staffordshire Council is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point South Staffordshire Council?

Claregate, Tettenhall (Osprey Charging) is 2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point South Staffordshire Council?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point South Staffordshire Council?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point South Staffordshire Council?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.