Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point St. Catherine's Leisure Park

St. Catherine's Leisure Park, Perth, PH1 5XA

Pod Point St. Catherine's Leisure Park is an EV charging site in Perth, Perth and Kinross, run by Pod Point. All 6 of its sockets are 75 kW CHAdeMO and CCS, and the published price is £0.76 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 94% uptime and recorded 293 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Pod Point Tesco Superstore - Edinburgh Road, 1.2 miles away.

Status

2 of 6 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 75 kW3 connectors · 75.6p per kWh1 free2 in use
Amoy-Roma86% reliabilityCharging
Lyla-Zaye92% reliabilityAvailable
Zaye-Amoy91% reliabilityCharging
CHAdeMO · 75 kW3 connectors · 75.6p per kWh1 free2 out of service
Amoy-Roma86% reliabilityOut of order
Lyla-Zaye92% reliabilityAvailable
Zaye-Amoy91% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
Contactless card at the chargerIn the Pod Point app
Charger ID
Amoy-Roma

Facilities

Leisure

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CHAdeMO75 kW75.6p per kWh
CCS75 kW75.6p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£42
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£30
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£38
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£32
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 75 kW CHAdeMO~54 min · ≈ 28 kWh · ~£21

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point St. Catherine's Leisure Park?

The listed price is £0.76/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point St. Catherine's Leisure Park?

Up to 75 kW DC via CHAdeMO, CCS.

How many charging sockets does Pod Point St. Catherine's Leisure Park have?

6 charging sockets: 3 × 75 kW CHAdeMO, 3 × 75 kW CCS. Live per-socket availability is shown on this page.

When is Pod Point St. Catherine's Leisure Park busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Pod Point St. Catherine's Leisure Park?

Amp Map measured 94% uptime here from recorded live status over the last 30 days, across 293 observed charging sessions.

Who operates Pod Point St. Catherine's Leisure Park?

Pod Point St. Catherine's Leisure Park is on the Pod Point network.

Where is the nearest other charger with 50 kW or more to Pod Point St. Catherine's Leisure Park?

Pod Point Tesco Superstore - Edinburgh Road is 1.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point St. Catherine's Leisure Park?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£42 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point St. Catherine's Leisure Park?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point St. Catherine's Leisure Park?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.