# Pod Point Teesside Shopping Park (Stockton Retail Park Limited)

Web page: https://ampmap.co.uk/charger/pod-point-teesside-shopping-park-uk

Pod Point Teesside Shopping Park (Stockton Retail Park Limited) is an EV charging site in Stockton-on-Tees, run by Pod Point. Its 18 sockets reach up to 22 kW, with Type 2 at the top speed, and the published price is £0.49 per kWh. Recorded live status shows it is usually busiest around noon, and Amp Map measured 83% uptime and recorded 930 charging sessions here over the last 30 days.

## Status

14 of 18 open at 22 Nov 2026, 18:14 UK time. Socket states change minute to minute - check before you travel.

## Location

- **Address:** Goodwood Square, TS17 7BW
- **Area:** Stockton-on-Tees, United Kingdom
- **Coordinates (latitude, longitude):** 54.55708, -1.27516
- **Getting there:** For any parking restrictions that may apply, please check relevant signage.

## Connectors and prices

| Connector | Power | Sockets | Price per kWh | Live status |
| --- | --- | --- | --- | --- |
| Type 2 | 22 kW | 8 | £0.49/kWh | 5 free, 1 in use, 2 out of service |
| Type 2 | 7 kW | 10 | £0.49/kWh | 9 free, 1 out of service |

Price at the charger, including VAT. Paying in the operator's app may cost less.

## Site information

- **Operator:** Pod Point
- **Opening hours:** Not published
- **Payment:** In the Pod Point app

## Common questions

### How much does it cost to charge at Pod Point Teesside Shopping Park (Stockton Retail Park Limited)?

The listed price is £0.49/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Pod Point Teesside Shopping Park (Stockton Retail Park Limited)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Pod Point Teesside Shopping Park (Stockton Retail Park Limited) have?

18 charging sockets: 8 × 22 kW Type 2, 10 × 7 kW Type 2. Live per-socket availability is shown on this page.

### When is Pod Point Teesside Shopping Park (Stockton Retail Park Limited) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around noon and quietest around 6 am. The live status on this page shows what is free before you set off.

### How reliable is Pod Point Teesside Shopping Park (Stockton Retail Park Limited)?

Amp Map measured 83% uptime here from recorded live status over the last 30 days, across 930 observed charging sessions.

### Who operates Pod Point Teesside Shopping Park (Stockton Retail Park Limited)?

Pod Point Teesside Shopping Park (Stockton Retail Park Limited) is on the Pod Point network.

### How long does a Tesla Model Y Long Range take to charge at Pod Point Teesside Shopping Park (Stockton Retail Park Limited)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£27 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Teesside Shopping Park (Stockton Retail Park Limited)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£20 at the published price). Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Pod Point Teesside Shopping Park (Stockton Retail Park Limited)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Stockton-on-Tees](https://ampmap.co.uk/chargers/united-kingdom/stockton-on-tees/stockton-on-tees)
- [Pod Point chargers](https://ampmap.co.uk/networks/pod-point)

## Chargers near this site

- [Morrisons Thornaby · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-thornaby-uk) - CCS 50 kW, CHAdeMO 50 kW · Thornaby
- [ubitricity Distributed Energy Systems UK Ltd. 53 Bruce Avenue](https://ampmap.co.uk/charger/ubitricity-53-bruce-avenue-uk) - Ubitricity · Type 2 5 kW · 53 Bruce Avenue · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 27 Northern Road](https://ampmap.co.uk/charger/ubitricity-27-northern-road-uk) - Ubitricity · Type 2 5 kW · 27 Northern Road · From 45p/kWh
- [Littleboy Recreation Ground Car Park 3 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-littleboy-recreation-ground-car-park-3-uk) - Type 2 22 kW · Acklam Road, Thornaby,
- [ubitricity Distributed Energy Systems UK Ltd. 64 Barker Road](https://ampmap.co.uk/charger/ubitricity-64-barker-road-uk) - Ubitricity · Type 2 5 kW · 64 Barker Road · From 45p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 141 West Lane](https://ampmap.co.uk/charger/ubitricity-141-west-lane-uk) - Ubitricity · Type 2 5 kW · 141 West Lane · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/pod-point-teesside-shopping-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Pod Point (synced 22 Nov 2026).

Always check directly with the charge point operator for the most up-to-date information.
