Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Pod Point · EV charging site

Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)

Shire Park, The Boulevard Welwyn Garden City, AL7 1GB

Pod Point Tesco Head Office - Omega Building (For staff and visitors use only) is an EV charging site in Welwyn Garden City, Hertfordshire, run by Pod Point. All 4 of its sockets are 7 kW Type 2, and the published price is £0.44 per kWh. Amp Map measured 72% uptime here over the last 30 days. 14 other charging sites are listed within a mile, and the nearest site with 50 kW or more is The Bakehouse, Welwyn Garden City (Osprey Charging), 0.5 miles away.

Status

3 of 4 available

Checking status…

VerifiedLive status and details from Pod Point’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

Type 2 · 7 kW4 connectors · 44.4p per kWh3 free1 out of service
Evan-Kate100% reliabilityAvailable
Evan-Kate100% reliabilityAvailable
Will-Neil0% reliabilityAvailable
Will-Neil0% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Pod Point
Opening hours
Not published
Payment
In the Pod Point app
Charger ID
Evan-Kate

Facilities

SupermarketTesco

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW44.4p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£25
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£18
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£23
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£23
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£19
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£18
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£12

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)?

The listed price is £0.44/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)?

Up to 7 kW AC via Type 2.

How many charging sockets does Pod Point Tesco Head Office - Omega Building (For staff and visitors use only) have?

4 charging sockets: 4 × 7 kW Type 2. Live per-socket availability is shown on this page.

How reliable is Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)?

Amp Map measured 72% uptime here from recorded live status over the last 30 days.

Who operates Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)?

Pod Point Tesco Head Office - Omega Building (For staff and visitors use only) is on the Pod Point network.

Where is the nearest charger with 50 kW or more to Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)?

The Bakehouse, Welwyn Garden City (Osprey Charging) is 0.5 miles away in a straight line, with up to 300 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£25 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£18 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Pod Point Tesco Head Office - Omega Building (For staff and visitors use only)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£23 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Pod Point · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.